Newkirk teamed up with its engineering subsidiary, Theka, on this design-build cogeneration project which included design, installation and commissioning of a 3.2 MW gas engine cogeneration system and substation.

Theka engineers provided construction management and designed the electric power grid interface, plant distribution and control systems. Newkirk constructed this 3.2 MW plant and installed switchgear as well as the plant's electrical system. Theka provided material acceptance testing and process commissioning.