Project Overview
This three-furnace electric melt iron foundry, featuring a complete sand system and two Disamatic mold lines, required fast-track construction capable of integrating numerous systems, from a variety of foundry process vendors. The project also demanded separate connections to the utility for both plant and furnace power.
Newkirk, working with Theka engineers, created a design-build turnkey solution to provide high voltage primary and secondary power distribution, as well as switchgear, an emergency power backup system and plant lighting.
Project: Ravenna Casting – Metal Technologies Plant
Type: Industrial
Location: Ravenna, Michigan
Role: Design-Build Engineer/Electrical Contractor