The design for this project utilized two 1600kW CAT engines for a total of 3.2MW. The Newkirk/Theka team provided complete design and installation of the engine generation station and controls, as well as designed and constructed the substation-utility interface.  The team integrated the design with the existing design in the original plant for the gas compression/cleanup station.