Newkirk's power line crews completed this 5.5 mile 46kV line rebuild that replaced an existing single circuit line with a double circuit 336.6 ACSR installed on new poles. The rebuilt line ties in a wind farm substation to the existing Amber Substation in Ludington. This project took about 3.5 months to complete.