Project Overview
For this project, Newkirk constructed a new 138kV collection substation, and the 46kV power lines connecting the collection substation with the interconnection substation for a 56-turbine
Project: Lake Winds Wind Farm Substation/Power Lines
Type: Wind
Location: Mason County, Michigan
Role: General/Electrical Contractor – Substation/Lines (Self Perform)