Project Overview
Newkirk provided construction of this new 15kv/138kV substation. The scope included installation of 158 drilled piers and 3 mass concrete foundations, structural steel, above and below grade conduit & grounding, 9 SF6 138kV breakers, 3 15kv/138kv transformers and two 15kV switchgear and relay panel control house. The substation was contained behind a brick wall enclosure to blend into the urban environment.
Project: Central Substation
Type: Substations
Location: Lansing, MI
Role: General Contractor – Self Perform