Project Overview
For this large and complex project, Newkirk provided all above grade construction activities to in-service the 765/345/138/12 kV station yards. This included all steel erection, installation and final connection of all required equipment and material, all cable trench (plastibeton), conduit / pull boxes, foundations, cable, oil containment, and other related equipment within the existing 345 kV station yard. Project highlights include setting six 175 ft pull off structures in under 2 weeks with 3 cranes and without incident. The project also included the line tie in and a 345/138kV line rerouting.
Project: Sorenson 765-345-138-12 kV Substation and Line Tie-In
Type: Substations
Location: Fort Wayne, IN
Role: General Contractor – Self Perform