Transmission/Distribution Lines
Newkirk Electric offers utility, municipal and industrial customers overhead and underground line construction and maintenance for a wide range of systems up to 765kV. For new installations, modifications, emergency storm restoration, or testing, Newkirk Electric has the resources to meet a wide range of customer needs.
- Turnkey services through 765kV
- Transmission and Distribution
- Underground and Overhead
- Wood Pole/Steel Pole/Lattice
- Drilled Pier Foundations
- Directional Boring
- Testing and Maintenance / Infrared Scanning
- Fiber Optic Services
- Vacuum Excavation
- Storm Restoration Services/Crews (nationwide)
Related Projects

Argonne National Laboratory 138kV Power Line Upgrade
Location: Lemont, IL
Role: Design-Build Contractor
Design-build for new 138kV substation and overhead power lines

Gary-Chicago Airport Substation-Power Line Upgrades
Location: Gary, IN
Role: Design-Build Engineer/Contractor
Design-build of 345kV substation and 345/138kV underground power lines

Power Line Storm Restoration
Location: US (nationwide)
Role: Electrical Contractor
Emergency Crews and equipment to restore power to storm damaged areas

Sorenson 765-345-138-12 kV Substation and Line Tie-In
Location: Fort Wayne, IN
Role: General Contractor – Self Perform
Complete construction of new 765/345/138/12 kV substation/switchyard and power line tie-in

Kenzie Creek-Corey Transmission Line
Location: Three Rivers, MI
Role: General Contractor – Self Perform
138kV Transmission Line Rebuild

Canton 138kV Transmission Line
Location: Canton, OH
Role: General Contractor – Self Perform
Upgrade/construction for 138kV transmission line project

Bridgeman-Derby-Cook 69kV Interconnect
Location: Bridgeman, MI
Role: Contractor – Self Perform
Construction of 69kV transmission lines at the DC Cook Nuclear Plant