Project Overview
Constructed four separate 69KV transmission lines connecting D.C. Cook Nuclear Power plant emergency power substation to two offsite power sources (Bridgeman and Derby substations). This project involved installing 10.5 miles of new transmission line. This consisted of 205 single circuit 69KV class steel structures, installation all new 765 KCMIL ACSR conductor, and removing the old 69KV wood pole line.
Project: Bridgeman-Derby-Cook 69kV Interconnect
Type: Transmission/Distribution Lines
Location: Bridgeman, MI
Role: General Contractor - Self Perform