Project Overview
This multi-phased project consisted of rebuilding 35 miles of transmission line between Pokagon and Corey substation. This involved installing 452 duel circuit 138KV class steel structures, installation all new 1033 KCMIL ASCR transmission conductor, and removing the old 69KV wood pole line. The access roads / right of way matting for the entire project including all applicable storm-water inspections was also included in this scope.
Project: Kenzie Creek-Corey Transmission Line
Type: Transmission/Distribution Lines
Location: Three Rivers, MI
Role: General Contractor – Self Perform