Project Overview
Newkirk Electric provided general construction (self-perform) services to upgrade this collection substation for a 200MW wind farm. Scope included building two new 345kV capacitor banks off of existing substation. Each capacitor bank included new foundations, 345kV gas circuit breakers, 345kV reactors, 345kV arrestors, CT's, and 345kV capacitor banks. All underground conduit and control wiring.
Project: Meadow Lake Wind Farm Substation Capacitor Bank
Type: Wind
Location: Chalmers, Indiana
Role: General/Electrical Contractor – Self Perform