Newkirk Electric provided general construction (self-perform) services to upgrade this collection substation for a 200MW wind farm. Scope included:

  • Build two new 345kV capacitor banks off of existing substation. 
  • Each capacitor bank included new foundations, 345kV gas circuit breakers, 345kV reactors, 345kV arrestors, CT's, and 345kV capacitor banks. 
  • All underground conduit and control wiring.